We have over the years worked on numerous projects and provided professional Building Surveying services to our clients in the form of countless roles. To give you a flavour of what we do here at Perito, we have compiled a selection of some of our more recent projects. Please take a look.
EXAM HALL
We were appointed as Employer’s Agent to assist the school in achieving their goal of providing a new modern, purpose built Exam Hall. The client brief set out the rooms and their occupancy for which the new building would be required to accommodate. The brief further detailed the principle and ancillary purposes for the building.
PUPIL ENTRANCE
The school identified a need for a dedicated pupil entrance, as visitors, staff and pupils were all utilising the principal entrance, passing through the main reception area. This dedicated pupil entrance has allowed pupils entering the school building to be monitored and provide a dedicated office where students can speak with staff privately.
North Worcester Primary Academy
North Worcester Primary Academy is a purpose built, two form entry infant and primary school, set over two floors. It was constructed on a brownfield site on the outskirts of Worcester. The project was procured and delivered through the governments Education Funding Agency Free Schools programme.
Multi Use Games Area (MUGA)
The school identified a need for the provision of a dedicated multi use games area, which pupils could utilise throughout the year. The MUGA was sized to the schools’ requirements totalling 300m2. It was to comprise of a tarmacadam finish and perimeter fencing, incorporating access gates, goals, basketball hoops and cricket wickets.
Trust Development Centre
The Trust Development Centre is a purpose built, two storey, 500m2 office building. The project was tendered via a two-stage tender process for a modular building.
Toilet Refurbishments
We have obtained funding for and delivered numerous toilet refurbishment works to pupil toilets. Typically, the works are undertaken during the school’s summer holiday period, due to the length of project programmes, noise and disruption that is caused.
Replacement of Flat Roof Covering
The school were encountering significant amounts of water ingress throughout various teaching areas each time it rained. We undertook a detailed inspection of the flat roof coverings and it was apparent the school required new flat roofs throughout.
Replacement of Pitched Roof Covering
The school advised us of an issue with water ingress, which upon inspection it became apparent the school required a new roof.
Lighting Upgrade to LED
Eligible schools were allocated additional DfE monies to prioritise works which would improve energy efficiency across the school’s estate. Due to our longstanding relationship with the school, they sought our assistance with advising them with how best to invest the capital funding on energy efficiency measures.